Clifton Engineering
▸ Office / warehouse / laboratory
Clifton Engineering relocated to a 25,000 square foot space that includes a large office component, a warehouse area, a laboratory space, and exterior staging area, the building fully meets their businesses needs. Calibre replaced over 250 LED light panels, upgraded the data network and fire alarm in the office space, while completely wiring the warehouse and laboratory to meet the power and HVAC requirements of the space.